Thursday, 26 October 2017

Dental Renovation Progress 9




I'm ready. The next step is a pre-application inspection supposed to be perform on Wednesday 25/10/2017. It's postponed due to one of the officer from KKM is not available. Another date will be announce in November. It was great

It gives me time to seat back and look at what are the things that maybe need to change in order to pass the inspection. Few issues need to be put into attention.

1. I need a signboard. A printed signboard design on a piece of A4 paper will do if I don't have a physical one. Bahasa Malaysia words must be bigger than an English Words.



2. Toilet byfold doors must be open toward outside. It was inside before. Changed it

3. A CF for autoclave and suction motor must be present to the officer. Done.

Made doa for me please



Monday, 16 October 2017

Dental Renovation Progress 8

Ready for inspection. All requirements checks. 



Pantry. 

Surgery 1

Corridor